Environmental Engineering – Multiple Choice Questions (MCQs)
-
-
74. What is "Water Hammer" in pipelines?
-
75. The "design period" for water supply projects is typically:
-
76. What is the "unit demand" for water supply?
-
77. What is the primary method of wastewater collection in urban areas?
-
78. The minimum velocity required in a sewer pipe to prevent solids from settling is called:
-
79. What is a "manhole" in a sewerage system?
-
80. The slope of a sewer pipe is designed to:
-
81. What is "Combined Sewer System"?
-
82. What is "Separate Sewer System"?
-
83. The primary advantage of a separate sewer system is:
-
84. What is "Biochemical Oxygen Demand (BOD5)"?